
TESC Operator's Manual, Rev 1.0
Getting Started
Unpack and inspect
Unpack and inspect the complete CANNON® Thermoelectric Sample Conditioner System and
all accessories as soon as they are received.
Caution: Many components are fragile. Use caution when moving and
handling the TESC System and accessories.
1. Carefully unpack the entire contents of the shipment.
2. Referring to the packaging list, verify that all materials were received.
3. Inspect materials for defects and shipping damage. Contact your CANNON®
representative to resolve any issues.
Table 4 — Packing list (TESC System)
MAINS AC pass-through power cable
Brookfield® DV2T viscometer
AC
AC
Brookfield® #4B2 insulated spindle
Brookfield® EZ-Lock spindle coupling
Komentarze do niniejszej Instrukcji